Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU XYZ Machine Tools MPU Hurco MPU Mills CNC MPU 2021 Bodor MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Brierley ZB 25/32 Drill Point Grinder 111151
 Brierley ZB 25/32  Drill Point Grinder, single phase, with cams.   

[Ref: 107687]
 Brierley ZB 25/32  Drill Point Grinder, single phase, with cams.  [Ref: 107687]...
Bowland Trading Ltd

Be seen in all the right places!

MMMA VILLAGE MACH 2024 MACH 2024 Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

London-Brighton line to be improved

Posted on 21 Feb 2017 and read 2434 times
London-Brighton line to be improved The Department for Transport has confirmed funding of £300 million to improve the London-Brighton main-line and associated routes, infrastructure manager Network Rail announced last month.

This will include track renewals, re-signalling and civil works to “improve resilience” in areas that are known to cause delays to Govia Thameslink Railway’s Southern and Thameslink services.

Tunnel repairs will include improved drainage to prevent water damage to electrical equipment. Cuttings and embankments are to be strengthened to reduce the risk of landslides, bridges are to be replaced and security measures will be reinforced to prevent trespassing.

Network Rail (www.networkrail.co.uk) managing director (South East) John Halsall said: “Passengers know only too well the challenges faced in running one of the busiest and most congested railway networks in the country.

“Working together with Govia Thameslink Railway, this much-needed funding will allow us to carry out essential upgrades to improve the reliability of journeys for passengers over the next few years.”