Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Mills CNC MPU 2021 Hurco MPU XYZ Machine Tools MPU Ceratizit MPU Bodor MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Jones & Shipman 1400, surface grinder 111142
Jones & Shipman 1400, surface grinder, fitted with 8 x 24 inch mag chuck, and 6 x 4 inch mag chu
Jones & Shipman 1400, surface grinder, fitted with 8 x 24 inch mag chuck, and 6 x 4 inch mag chu...
Bowland Trading Ltd

Be seen in all the right places!

Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

Sea Swift platform installed

Posted on 17 Jun 2017 and read 4064 times
Sea Swift platform installedAquaterra Energy (www.aquaterraenergy.com), a leading global provider of offshore engineering solutions, has designed, fabricated and installed a new Sea Swift platform for PICO Petroleum Integrated Services, which is the lead contractor for Amal Petroleum Co’s (Amapetco) Amal field in the Gulf of Suez (offshore Egypt).

This development will open new opportunities for future co-operation between the two companies in large projects, both in Egypt and the Middle East.

The Sea Swift, which is a ‘conductor supported platform’ (CSP) installed in 23m of water, includes a 385-tonne topside (featuring a helideck and emergency accommodation) with provision for six wells.

The new topside facility for the Amal-C platform involved design, piping, electrical, instrumentation, control systems and technical safety — plus the design of the new sub-sea production pipelines to the Amal-A platform. The project, which took 18 months from design to installation, involved building a bridge link to the neighbouring Amal-B platform and reconfiguring the topside pipework.

George Morrison, managing director of Aquaterra Energy, said: “The deployment of CSPs is increasing, due to growing demand for modularised wellhead platforms that can be built and installed in smaller packages across a number of fabrication yards.

“The bespoke design also negates the need for diver or ROV involvement and any ‘hot work’, which mitigates inherent risk and scheduling problems while cutting incremental costs. In addition, it can potentially increase local content, if this is an economic or political driver for the project.”