Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Mills CNC MPU 2021 Hurco MPU XYZ Machine Tools MPU Bodor MPU Ceratizit MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Barber Colman Gear Horizontal Hobbing Machine 111124
Barber Colman Gear Horizontal Hobbing Machine model 6 x 10, Serial number B06, with speed/feed chang
Barber Colman Gear Horizontal Hobbing Machine model 6 x 10, Serial number B06, with speed/feed chang...
Bowland Trading Ltd

Be seen in all the right places!

Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

Vattenfall reveals Norfolk Vanguard plans

Posted on 20 Nov 2017 and read 4537 times
Vattenfall reveals Norfolk Vanguard plansSwedish developer Vattenfall (corporate.vattenfall.com) has unveiled the latest designs for its 1.8GW Norfolk Vanguard offshore wind farm off the east coast of the UK.

The company published the results of initial survey work in its preliminary environmental information report at the end of October, which will inform the project’s final design plans.

Vanguard will feature up tp 257 turbines (between 7MW and 20MW), and the company said it is still deciding on a range of foundation types for the project — including jackets, monopiles, gravity base, suction caisson and floating designs.

The report includes plans for up to six cables that will bring power ashore just south of Happisburgh. Vattenfall has narrowed the possible locations for onshore booster stations down to two sites — one at Ridlington, the other east of Crostwright.

The project will connect to the National Grid at the Necton sub-station in Norfolk, which will need to be enlarged.

The company is running formal consultations until 11 December, before submitting a Development Consent Order to the UK Planning Inspectorate next summer.