Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
XYZ Machine Tools MPU Hurco MPU Bodor MPU Mills CNC MPU 2021 Ceratizit MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Tool and Cutter grinding Attachments. 111146
Tool and Cutter grinding Attachments.  

[Ref: 107682]
Tool and Cutter grinding Attachments. [Ref: 107682] ...
Bowland Trading Ltd

Be seen in all the right places!

MMMA VILLAGE MACH 2024 MACH 2024 Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

Investors plan to develop Uzbekistan’s gas field

Posted on 04 Jan 2018 and read 3529 times
Investors plan to develop Uzbekistan’s gas fieldA consortium of investors plans to develop Uzbekistan’s “25 Years of Independence” gas field in the southern part of the country.

The first of two stages will begin 2017-18 with the drilling of a ‘confirmation well’ and developing a feasibility study on expected reserves.

The second stage will include field development, geological exploration and the construction of a gas conversion facility and chemical complex to produce high-value-added products.

The gas field will become a raw-material base for the gas chemical complex, producing polyethylene, polypropylene and sulphur, later expanding to include olefins (ethylene glycol, rubber, polyethylene terephthalate and other products).

The gas reserves are estimated to be more than 100 billion m3.