Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU XYZ Machine Tools MPU Mills CNC MPU 2021 Hurco MPU Bodor MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Bridgeport Turret Mill Vari Speed 111218
Bridgeport Turret Mill Vari Speed, Power in X, 2 Axis DRO, Table Guard, Lovo Lamp, Coolant. Ex
Bridgeport Turret Mill Vari Speed, Power in X, 2 Axis DRO, Table Guard, Lovo Lamp, Coolant. Ex ...
Bowland Trading Ltd

Be seen in all the right places!

Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

Gas pipeline contract for Rolls-Royce

Posted on 07 Oct 2013 and read 2212 times
Gas pipeline contract for Rolls-Royce Rolls-Royce has won a contract worth £111.5 million to supply equipment and services for a gas pipeline between Kazakhstan and China. The Derby-based company’s Quebec and Mount Vernon facilities will supply Asia Gas Pipeline — a joint venture between Kazakhstan’s Kaz Munai Gaz and China’s National Petroleum Corporation — with 12 RB211 gas turbine-driven pipeline compressor units that will operate at four compressor stations along the 1,115km Line C Pipeline. This is part of a 1,833km-long pipeline network that, when it reaches full capacity in 2016, will transport gas from Turkmenistan and Uzbekistan, through Uzbekistan and Kazakhstan, to China.

Beimbet Shayakhmetov, general director of Asia Gas Pipeline, said: “The AGP Pipeline will help to meet Kazakhstan’s domestic energy needs and to stabilise China’s energy consumption with cleaner natural gas. Given the huge scale and tight construction schedule of this project, we need on-time delivery of reliable and efficient technology. Rolls-Royce’s proven technology provides an excellent fit, and we are delighted to again co-operate with them to support us in transportation of the gas.”