Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Mills CNC MPU 2021 Bodor MPU XYZ Machine Tools MPU Ceratizit MPU Hurco MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Buck and Hickman 6 inch ‘Bar Straightening Press 111143
Buck and Hickman 6 inch ‘Bar Straightening Press’  serial number 9541  

[Ref: 107679]
Buck and Hickman 6 inch ‘Bar Straightening Press’  serial number 9541 [Ref: 107679] ...
Bowland Trading Ltd

Be seen in all the right places!

MMMA VILLAGE MACH 2024 MACH 2024 Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

Westinghouse Electric wins reactor deal

Posted on 02 Sep 2014 and read 1352 times
Westinghouse Electric wins reactor dealWestinghouse Electric Co — a member of the Toshiba Corporation — has won a contract worth more than 40 million euros from Teollisuuden Voima Oyj (TVO) for 12 advanced internal pumps for Finland’s Olkiluoto Units 1 and 2 boiling-water reactors.

This investment — a prerequisite for the long-term, safe and reliable operation of the nuclear reactors — will also allow for possible future expansion.

Under the terms of the contract, Westinghouse Electric Sweden AB will be responsible for managing the overall project, as well as installation and commissioning.

It will partner with KSB AG for the manufacturing and testing of the pumps and valves plus equipment testing; this will include a full-scale test performed by Toshiba Corporation in Japan.

The reactor internal pumps are part of the main circulation circuit that ensures the flow of water through the reactor core. Each reactor vessel has six internal pumps. Installation and testing will take place during scheduled mainenance periods in 2016, 2017 and 2018.