Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU XYZ Machine Tools MPU Mills CNC MPU 2021 Bodor MPU Hurco MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Barnes 15 Ton 48 inch hydraulic Pressbrake 111230
Barnes 15 Ton 48 inch hydraulic PressbrakeEx University due in to Bowland Darwen works, May 2024, ca
Barnes 15 Ton 48 inch hydraulic PressbrakeEx University due in to Bowland Darwen works, May 2024, ca...
Bowland Trading Ltd

Be seen in all the right places!

Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

Shell to ramp up gas production

Posted on 13 Dec 2018 and read 2599 times
Shell to ramp up gas productionShell (www.shell.co.uk) is to increase the amount of gas processed at its Norfolk terminal by 16%, securing the future of the facility for the foreseeable future.

The firm has spent £300 million updating the plant at Bacton to allow 400 million ft3 of gas to be processed each day.

Shell general manager Anne O’Halloran said: “This means we can use the facilities more and reduce operating costs.”

The firm is also drilling more wells in the Southern North Sea gas field, and the extra capacity at Bacton enables it to take gas from the Spirit Energy-owned Clipper South field, which is about 45 miles off the coast.