Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU Hurco MPU XYZ Machine Tools MPU Mills CNC MPU 2021 Bodor MPU

Machinery-Locator
The online search from the pages of Machinery Market.

MAZAK Variaxis J500-5AX 5-Axis Machining Centre (2014)
Traverses X Y Z: 350 x 550 x 510mm, 
table size 500 x 400mm, 
workpiece weight 200kg, 
workpiece
Traverses X Y Z: 350 x 550 x 510mm, table size 500 x 400mm, workpiece weight 200kg, workpiece ...
Percy Martin Ltd

Be seen in all the right places!

Metal Show & TIB 2024 Plastics & Rubber Thailand Intermach 2024 Metaltech 2024 Subcon 2024 Advanced Engineering 2024

Rail manufacturing facility to create up to jobs

Posted on 21 May 2019 and read 2630 times
Rail manufacturing facility to create up to jobsRail transit company Siemens Mobility Ltd (www.siemens.com) has officially submitted an application to East Riding Council for a rail manufacturing facility to be built in East Yorkshire.

The proposed £200 million development in Goole comprises 80,000m2 of manufacturing, commissioning and warehouse space, as well as a four-storey 5,000m2 office building.

The company won a £1.5 billion contract in November from London Underground Ltd for the regeneration of the Piccadilly Line.

If its application is successful, the first phase of the new facility is expected to open in 2023, with the site due to be fully operational by 2025, creating up to 700 direct jobs and a further 1,700 jobs in the UK supply chain.

Will Wilson, managing director of rolling stock at Siemens Mobility, said: “This is a major step forward for our plans.

“With digitalisation, we can help to make trains and infrastructure intelligent; reaching this milestone furthers our vision to create a sustainable, technically advanced facility that is an asset to the UK.”