Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Thame Workholding Baltec Ceratizit MPU Mills CNC MPU 2021 Hurco MPU

Machinery-Locator
The online search from the pages of Machinery Market.

OPTIMUM OPTI S275G Saw
Pivot action. 
Year 2005. 
225mm tubes at 90degrees, 
180mm x 245mm sections
Pivot action. Year 2005. 225mm tubes at 90degrees, 180mm x 245mm sections...

Be seen in all the right places!

MACH 2028

NSW wins contract by Northwester NV

Posted on 12 Sep 2018. Edited by: John Hunter. Read 3010 times.
NSW wins contract by Northwester NV Germany-based NSW, a subsidiary of General Cable (www.generalcable.com) (which recently became part of Prysmian Group), has been awarded a contract by Northwester NV for the development of a submarine inter-array power cable system for the Northwester 2 offshore wind farm, located in the Belgian North Sea about 50km north west of Oostende.

NSW will design and produce 25km of 33kV submarine power cables; it will also be responsible for pre–operation cable termination and testing. The submarine cables are scheduled for delivery in summer 2019.

The Northwester 2 off-shore wind farm comprises 23 MHI Vestas Offshore Wind 164-9.5MW turbines, which will generate 219MW. Once completed in 2020, the wind farm will provide renewable energy to more than 220,000 homes.