Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Mills CNC MPU 2021 Thame Workholding Ceratizit MPU Hurco MPU Baltec

Machinery-Locator
The online search from the pages of Machinery Market.

QUASER MV204 Vertical Machining Centre (2016)
Fanuc 31-iB, 
travels 1,270 x 700 x 610mm, 
table 1,400 x 700mm, 
12,000rpm, 
BT40, 
30 ATC,
Fanuc 31-iB, travels 1,270 x 700 x 610mm, table 1,400 x 700mm, 12,000rpm, BT40, 30 ATC, ...

Be seen in all the right places!

Indo Machinery Investment & Trade Show 2026 MTA Hanoi 2026 Advanced Engineering 2026 MACH 2028

NSW wins contract by Northwester NV

Posted on 12 Sep 2018. Edited by: John Hunter. Read 2812 times.
NSW wins contract by Northwester NV Germany-based NSW, a subsidiary of General Cable (www.generalcable.com) (which recently became part of Prysmian Group), has been awarded a contract by Northwester NV for the development of a submarine inter-array power cable system for the Northwester 2 offshore wind farm, located in the Belgian North Sea about 50km north west of Oostende.

NSW will design and produce 25km of 33kV submarine power cables; it will also be responsible for pre–operation cable termination and testing. The submarine cables are scheduled for delivery in summer 2019.

The Northwester 2 off-shore wind farm comprises 23 MHI Vestas Offshore Wind 164-9.5MW turbines, which will generate 219MW. Once completed in 2020, the wind farm will provide renewable energy to more than 220,000 homes.