Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU Mills CNC MPU 2021 Hurco MPU

Machinery-Locator
The online search from the pages of Machinery Market.

KEETONA HUF818 POWER FOLDER
Length 100`, capacity - 100 x 1/8` / 60 x 3/16` / 40 x 1/4`, max beam lift 8`, main motor 5kw, beam
Length 100`, capacity - 100 x 1/8` / 60 x 3/16` / 40 x 1/4`, max beam lift 8`, main motor 5kw, beam ...

Be seen in all the right places!

Maktek Smart Manufacturing Indonesia 2025 Steelfab 2026 Southern Manufacturing 2026 MACH 2026

A call for re-think on HS2

Posted on 24 Jun 2015. Edited by: John Hunter. Read 4507 times.
A call for re-think on HS2The head of North and Western Lancashire Chamber of Commerce (www.lancschamber.co.uk) is calling for a re-think on the Government’s plans for high-speed rail links with London.

Earlier this month, Transport Secretary Patrick McLoughlin pledged that HS2 will go ahead, with work on phase one — the connection between Birmingham and London — beginning in 2017 and the so-called ‘Y network’ — the lines to Leeds and Manchester — following soon after.

Babs Murphy, chief executive of the Chamber, said: “I would ask the Government to re-consider the decision to end the line at Manchester — and bring it into Lancashire. The North West of England does not stop at Manchester.

Extending the line to Preston would provide a greater connectivity, not just to Lancashire, but to Cumbria, Scotland and the whole of the North West.”