Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU Mills CNC MPU 2021 Hurco MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Used Optimum B28H Pillar Drill (4828)
Used Optimum B28H Pillar Drill, 2015, Drilling capacity steel - 28mm, Table 340 x 360mm,  belt chang
Used Optimum B28H Pillar Drill, 2015, Drilling capacity steel - 28mm, Table 340 x 360mm, belt chang...

Be seen in all the right places!

EMO 2025 Maktek Konya Advanced Engineering 2025 Maktek Smart Manufacturing Indonesia 2025 MACH 2026

EuroMaint expands Örebro facility

Posted on 10 Dec 2015. Edited by: John Hunter. Read 5891 times.
EuroMaint expands Örebro facility SJ AB — a government-owned passenger train operator in Sweden — has signed a new contract with EuroMaint Rail AB for the reprocessing of bogies for its passenger carriages and X2000 vehicles.

The new contract comes into force on 1 March 2016 and ensures the continuation of the current one; it gives EuroMaint responsibilities that extend from revision to corrective maintenance.

The work will take place at EuroMaint’s facility in Örebro, Sweden, which has been upgraded to bring all operations under one roof and ensure that it can handle this larger contract.

Björn Holmberg, chief purchasing officer at SJ AB, said: “EuroMaint has extensive experience and meets our high requirements for availability, reliability and punctuality. We see several advantages to continuing our collaboration with EuroMaint.”