22 turbines installed in Uruguay

Posted on 11 Oct 2017 and read 629 times
22 turbines installed in UruguayFair Wind (www.fairwind.dk) has completed the installation of 22 Enercon E-92 turbines at the 51.7MW Cerro Grande wind farm in Uruguay.

The Danish company said it completed the 10-month job for developer Wobben Windpower “with no serious or minor accidents reported”.

Maciej Suchy, Fair Wind’s chief operation officer (installation), said: “I’m really proud of our performance at Cerro Grande. Once again, we have made the case that our partnership approach is the key to quality results at these projects.”

Be seen in all the right places!

High-Tech Manufacturing & Engineering Expo MTA Vietnam 2018 Maktek Eurasia 2018 MTA Hanoi 2018 Indusmach Africa 2018 (Tanzania) Advanced Engineering UK 2018 Metalex 2018 Machine Tool Indonesia 2018 India Export News Steelfab 2019 Expo Manufactura 2019 MACH 2020

Machinery-Locator
The online search from the pages of Machinery Market.

2000 DMG DMU 200 P
5-axis Universal Machining Centre

Heidenhain TNC 430
Table size 1700 × 1400 mm.
X/Y/Z Travels 1
5-axis Universal Machining Centre Heidenhain TNC 430 Table size 1700 × 1400 mm. X/Y/Z Travels 1...
MazMac Ltd