£700,000 Blend Centre successfully installed

Posted on 20 Jan 2020 and read 394 times
£700,000 Blend Centre successfully installedPerth-based Edwards Engineering (www.edwardsengineering.co.uk) — a provider of mechanical, electrical and structural engineering services — has successfully managed the development and installation of a new £700,000 Blend Centre for local independent bottling company Broxburn Bottlers.

Incorporating facilities for filling and emptying tankers, vats and casks, the project was delivered in parallel with a bonded warehouse development.

Broxburn’s engineering manager, Bill Richards, said: “A high level of automation was specified for this project, and the new facility can operate with a minimum of personnel.

“The completed Blend Centre went smoothly into production, with frequent tanker movements and the cask warehouses filling up fast.”

Be seen in all the right places!

Shenzhen International Machinery Manufacturing MTA Vietnam 2020 Subcon 2020 TCT 3SIXTY Toolex 2020 Metal Show & TIB MTA Hanoi ITM Industry Europe 2020 Advanced Engineering 2020 Metaltech 2020 Manufacturing & Supply Chain Expo Machine Tool Indonesia 2020 MACH 2021 FITMA 2021