Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU Hurco MPU Mills CNC MPU 2021

Machinery-Locator
The online search from the pages of Machinery Market.

Mazak Quick Turn Smart 200M with Mazatrol Smart Control (2011)
215mm 2-Jaw Chuck, 
12-Station ATC, 
Live Tooling,
Powered Tail Stock, 
Travel X = 225mm, Z = 60
215mm 2-Jaw Chuck, 12-Station ATC, Live Tooling, Powered Tail Stock, Travel X = 225mm, Z = 60...

Be seen in all the right places!

Manufacturing Indonesia 2025 Steelfab 2026 Southern Manufacturing 2026 MACH 2026 Metal Show & TIB 2026

GKN agrees Boing 777X wiring contract

Posted on 25 Feb 2020. Edited by: John Hunter. Read 2108 times.
GKN agrees Boing 777X wiring contractGKN Fokker Elmo has signed a contract to supply electrical wiring interconnection systems (EWIS) for the new Boeing 777X family.

Production will start at the end of Q1 2020. The 777X EWIS will be made at a number of strategic global locations, including China, the Netherlands, and a new wiring facility in Pune (India).

GKN Fokker Elmo has supplied EWIS to Boeing for more than a decade for the 777, 737 and P-8A.

John Pritchard, president (civil airframes) at GKN Aerospace, said: “We are extremely proud of our participation in the 777X programme.

"It is great that we can contribute to this advanced aircraft, which completed its maiden flight on 25 January 2020.

“We have been producing EWIS for Boeing aircraft for many years, and this new contract award means that we have now strengthened our business relationship for many more years to come.”