Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU Hurco MPU Mills CNC MPU 2021 Subcon MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Tos Kurim Milling Machine Model FNK25A
Model: FNK25A
Serial No: 4AP90-6
Made in the Czech Republic

Quality European-built universal mi
Model: FNK25A Serial No: 4AP90-6 Made in the Czech Republic Quality European-built universal mi...

Be seen in all the right places!

MACH 2026 Metal Show & TIB 2026 Plastics & Rubber Thailand Intermach 2026 ITM Industry Europe 2026 Subcon 2026 Manufacturing Surabaya 2026

Airbus-built forest-measuring satellite shipped to Kourou

Posted on 02 Mar 2025. Edited by: John Hunter. Read 1719 times.
Airbus-built forest-measuring satellite shipped to KourouBiomass satellite being packed ready for shipment

Biomass, the European Space Agency’s (ESA) Airbus-built satellite, has left Toulouse for its journey by ship to Kourou, French Guiana, ready for launch. An Earth Explorer satellite, Biomass is ESA’s flagship mission to measure forest biomass to assess terrestrial carbon stocks and fluxes from an altitude of 666km above the Earth”s surface. The spacecraft will carry the first space-borne P-band synthetic aperture radar, delivering exceptionally accurate maps of tropical, temperate and boreal forest biomass.

Alain Fauré, head of space systems at Airbus Defence and Space, said: “Shipping this flagship mission is a major milestone after years of hard work and dedication from all our teams. The satellite’s groundbreaking technology will enable climatologists to accurately assess carbon stocks and fluxes from space and improve the understanding of the part that forests play in regulating climate.”

The spacecraft features a large 12 x 15m deployable antenna to capture the reflected SAR data that will be used to provide accurate global maps of tropical, temperate, and boreal forest biomass. Data on changes in biomass due to forest loss (for example from logging/burning) and regrowth is unattainable by ground measurement techniques.

Airbus engineers from Stevenage, where the satellite was built, led the successful test campaign in Toulouse, supported by colleagues on-site and from Airbus in Friedrichshafen (Germany), plus the wider industrial team. The teams will now prepare for the in-orbit commissioning and operational phases, with a separate team managing the delivery of the ground calibration transponder, located in New Norcia, Australia. The Biomass satellite’s development and testing have involved more than 50 companies across 20 countries.

Biomass is scheduled to launch in April 2025 on a Vega-C rocket from Kourou and will operate in orbit for five years.