Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Hurco MPU Mills CNC MPU 2021 Ceratizit MPU

Machinery-Locator
The online search from the pages of Machinery Market.

PROMECAM 8025 HYDRAULIC UPSTROKE PRESSBRAKE
Length 2500mm, tonnage 80ton, between frames 2150mm, throat 400mm, Hurco 7 twin axis control, guards
Length 2500mm, tonnage 80ton, between frames 2150mm, throat 400mm, Hurco 7 twin axis control, guards...

Be seen in all the right places!

EMO 2025 Maktek Konya Advanced Engineering 2025 Maktek Smart Manufacturing Indonesia 2025 MACH 2026

Kent Renewable Energy biomass plant fires up

Posted on 17 Oct 2018. Edited by: John Hunter. Read 2756 times.
Kent Renewable Energy biomass plant fires upCopenhagen Infrastructure Partners (CIP) has announced that the Kent Renewable Energy (www.kentrenewableltd.com) combined heat and power plant (CHP), with a capacity of 27MW, commenced operations last month.

Located in Sandwich, the plant produces ‘renewable’ heat and power that is delivered to nearby Discovery Park (a business and science park) and to local power consumers connected to energy provider UK Power Network’s grid.

Christina Grumstrup Sørensen, senior partner with CIP (www.cipartners.dk), said: “After a 25-month construction period, this is the moment we have all been looking forward to.

“We are delighted to see renewable power and heat being generated and delivered to local customers, based on locally sourced wood.

“We have completed yet another successful biomass project ahead of time and within budget, in strong co-operation with local authorities and our business partners.”