Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Baltec Mills CNC MPU 2021 Hurco MPU Thames Workholding Subcon MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Cantilever Bar Storage System including:
3x Kredit Mobikant mobile 7-section double-sided cantilever bar storage rack system, 
2,300mm wide,
3x Kredit Mobikant mobile 7-section double-sided cantilever bar storage rack system, 2,300mm wide,...

Be seen in all the right places!

Metal Show & TIB 2026 Intermach 2026 Plastics & Rubber Thailand METALTECH & AUTOMEX ITM Industry Europe 2026 Subcon 2026 MTA Vietnam 2026 Manufacturing Surabaya 2026 Indo Machinery Investment & Trade Show 2026 MTA Hanoi 2026 MACH 2028

Minesto’s tidal power plant reaches ‘performance milestone’

Posted on 01 Jul 2025. Edited by: Colin Granger. Read 1337 times.
Minesto’s tidal power plant reaches ‘performance milestone’The ocean energy developer Minesto recently announced that its Dragon 12 tidal energy system (Luna), installed in Vestmannasund (Faroe Islands), has met a major production performance milestone, after a 10m-longer tether enabled a 25% increase of power performance, thereby ‘strengthening the company’s path toward commercial-scale deployment of its tidal kite technology’.

Martin Edlund, Minesto’s CEO, said these results further validate production volumes used in Minesto’s business cases for commercial buildout in the Faroe Islands. “We are really pleased to have Dragon 12 in operation with increased performance in solid alignment with computer simulated predictions. This underscores the electricity production volumes used in our Dragon farm business cases and thereby reduce investor risks.

“In addition to Dragon 12 showcasing technical performance, the production site in Vestmanna continues to serve as a live demonstration platform. Recent visits from utility partners, energy ministries, and potential commercial customers have further positioned the site as a central reference case in the global marine energy landscape; and with the generated Dragon 12 production data and solid build-out plans in place, we are eager to engage investors and partners in taking the next step towards the world’s first Dragon Farm — an array of Minesto’s unique power plants.”