Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU Mills CNC MPU 2021 Hurco MPU

Machinery-Locator
The online search from the pages of Machinery Market.

EUROPA 2000VS
Year 2012. 
Power feed on long and cross, 
DRO, 
R8 spindle. 
Ex R&D prototype shop
Year 2012. Power feed on long and cross, DRO, R8 spindle. Ex R&D prototype shop...

Be seen in all the right places!

Metalshow & TIB 2025 Plastics & Rubber Thailand 2025 METALTECH & AUTOMEX 2025 Intermach 2025 ITM Industry Europe Smart Manufacturing Week 2025 Subcon 2025 EMO 2025 Maktek Konya Advanced Engineering 2025 Maktek Smart MACH 2026

Sheffield Forgemasters signs contract for new furnaces

Posted on 21 Oct 2024. Edited by: John Hunter. Read 859 times.
Sheffield Forgemasters signs contract for new furnacesAs part of a substantial recapitalisation programme, Sheffield Forgemasters has signed a contract with Dewsbury-based Northern Combustion Systems (NCS) for the supply of two, bespoke, Top Hat furnaces for a new forging line under a multi-million-pound contract, which will enable the Sheffield company to manufacture critical components for the UK/SSN-AUKUS submarine programmes and other key defence programmes.

Following a robust tender process, which considered cost, delivery and capabilities, NCS will deliver furnaces with a distinctive lift-off cover appearance, with both furnaces adopting a hydraulically-operated lift and a traverse cover for the heat treatment of long, forged components.

Craig Fisher, programmes director at Sheffield Forgemasters, said: “Northern Combustion Systems has 40 years’ experience in industrial furnaces manufacture and are providing Sheffield Forgemasters with two new highly-efficient recuperative and modulating Top Hat furnaces.

“The furnaces will support our forging programme and the largest of the two includes an integral quench tank and is designed for longer forgings, while the smaller furnace will support ingot and bar heat treatments.”

Installation of the furnaces is scheduled for October 2025 and April 2027 as part of an investment programme to create new, unmatched facilities for the supply of defence-specific forgings and castings, and they will operate alongside seven larger furnaces.

Top Hat Furnaces feature a fixed hearth, with a removable cover, which contains the gas burners and refractory material. The new Sheffield Forgemasters furnaces measure 11m long x 10m wide x 6m tall for the smaller of the two, and 30m long x 11m wide x 6m tall for the largest.