Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Hurco MPU Mills CNC MPU 2021 Ceratizit MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Danobat CP11.11 Bandsaw 2009
Danobat CP11.11 Horizontal Bandsaw
Serial Number 0909901302
Year 2009
Max Size 1100mm x 1100mm
V
Danobat CP11.11 Horizontal Bandsaw Serial Number 0909901302 Year 2009 Max Size 1100mm x 1100mm V...

Be seen in all the right places!

EMO 2025 Manufacturing World Osaka 2025 Maktek Konya Advanced Engineering 2025 Maktek Smart Manufacturing Indonesia 2025 Southern Manufacturing 2026 MACH 2026

Stronelairg onshore wind farm completed

Posted on 08 Jan 2019. Edited by: John Hunter. Read 3174 times.
Stronelairg onshore wind farm completedPerth-based SSE (www.sse.com) has completed the construction and commissioning of the £350 million 66-turbine/228MW Stronelairg wind farm, near Fort Augustus in the Scottish Highlands.

This takes the Scottish energy company’s onshore wind-farm capacity to 2,143MW and its total renewable-energy capacity (including pumped storage) to 3,955MW.

That total will increase to 4,190MW when the Beatrice offshore wind farm in the Moray Firth is completed in the spring of 2019, but it may be closer to 4,030MW if SSE completes the sale of stakes of up to 50% in Stronelairg and in Dunmaglass onshore wind farm.

The potential sale of these stakes is in line with SSE’s strategy of creating value from developing and operating assets, as well as owning them.

If the stakes are sold, SSE will continue to be the operator of both wind farms and will retain significant future development rights in relation to them.

The Stronelairg wind farm is situated in a natural bowl on a plateau that is on average 600m above sea level.

It is set well back from Loch Ness, so that no turbines are visible from the main tourist routes. In line with SSE’s commitment to sharing value, local communities will benefit from an investment fund.

SSE announced in November that it is consolidating the development, operation and ownership of its renewable-energy assets in the UK and Ireland under a single entity to be known as SSE Renewables.

Its future onshore wind-farm ‘pipeline’ consists of over 800MW of potential new-build projects.

Martin Pibworth, SSE wholesale director, said: “The completion of Stronelairg confirms SSE’s position as the owner and operator of the most renewable-energy capacity in the UK and Ireland.

“Through SSE Renewables, we want to build on our established skills in asset management and large capital-project development to achieve future growth and maximise our contribution to the on-going decarbonisation of the electricity system.”