Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Ceratizit MPU Hurco MPU Mills CNC MPU 2021

Machinery-Locator
The online search from the pages of Machinery Market.

Durma DCB – M 560 / 750 Horizontal Mitre Bandsaw
Durma DCB – M 560 / 750 Horizontal Mitre Bandsaw
Serial Number 804813054
Year 2013
Swivel Vice
S
Durma DCB – M 560 / 750 Horizontal Mitre Bandsaw Serial Number 804813054 Year 2013 Swivel Vice S...

Be seen in all the right places!

EMO 2025 Manufacturing World Osaka 2025 Maktek Konya Advanced Engineering 2025 Maktek Smart Manufacturing Indonesia 2025 Southern Manufacturing 2026 MACH 2026

Fit-out underway at renewable-hydrogen factory

Posted on 07 Feb 2020. Edited by: John Hunter. Read 2493 times.
Fit-out underway at renewable-hydrogen factorySheffield-based ITM Power, a world leader in the manufacture of hydrogen energy systems, has begun the fit-out of its new factory at Bessemer Park to house its 185 employees and meet strong international demand for its products.

The 134,000ft2 factory will include an extension to the existing offices, stack manufacturing and production areas, as well as test room for factory acceptance testing of products.

It will enable the company to produce 1GW of polymer electrolyte membrane (PEM) electrolysers within three years.

The programme of works will last 30 weeks, and the site is expected to be ready for occupation in the autumn of this year.

In October, ITM Power (www.itm-power.com) announced a joint venture with Linde AG to deliver hydrogen to large-scale industrial projects.

Graham Cooley, CEO, said: “This fit-out will see ITM Power undertaking ‘state of the art’ manufacturing and reducing costs and lead times to access the many opportunities arising from the joint venture with Linde.”