Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Bodor MPU XYZ Machine Tools MPU Ceratizit MPU Hurco MPU Mills CNC MPU 2021

Renault announces two second-life battery projects

Posted on 26 Oct 2020 and read 1340 times
Renault announces two second-life battery projectsGroupe Renault is collaborating on two new second-life battery programmes with the SmartHubs Project in the UK and Advanced Battery Storage in France, two of the largest projects of this kind in Europe.

The aim is to bridge the gap between electricity consumption and production in order to increase the share of renewable energy, as well as maintaining the balance between supply and demand on the grid by integrating different energy sources with intermittent production capacities.

The SmartHubs project, in collaboration with Connected Energy is located in West Sussex. Over 1,000 second-life batteries from Renault vehicles will be used alongside other technologies as part of a local energy system to help provide cleaner, lower-cost energy for use in social housing, transport, infrastructure, private homes and local businesses. The second-life batteries will be installed into Connected Energy’s specially designed E-STOR systems.

The SmartHubs project involves the installation of several 360kWh E-STOR systems on industrial and commercial sites, with some linked to solar panels and electric vehicle chargers to help sites reduce energy costs and optimise the use of renewable energy.

A large E-STOR Cluster system using around 1,000 second-life batteries to store 14.5MWh of energy will also be installed. which will rapidly charge and discharge to help balance the electricity network. It will store enough energy to power 1,695 average homes for a full day. The project is one of four UK Government-initiated projects designed to help design the energy systems of the future.

This large-scale project is being carried out by a consortium led by Connected Energy with partners Moixa, PassivSystems, ICAX, Newcastle University, West Sussex County Council and Innovate UK.

In Douai, France, the first Advanced Battery Storage has just been installed at the Renault Georges Besse plant with a capacity to store 50 MWh across several sites.

The energy storage systems make it possible to regulate and stabilise the network by charging the batteries when demand is low, then returning the energy contained in these batteries back into the network as soon as demand is high again.

The Advanced Battery Storage system uses second-life batteries, as well as new batteries, stored for future aftermarket use for a total capacity close to 5MWh. The Advanced Battery Storage project has been carried out in close collaboration with partners Banque des Territoires, Nidec, The Mobility House, Demeter, and with the Ecological Transport Modernisation Fund.