Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
XYZ Machine Tools MPU Mills CNC MPU 2021 Ceratizit MPU Hurco MPU AMMU MPU banner

Machinery-Locator
The online search from the pages of Machinery Market.

DMG Mori NTX1000 HSC WMZ Lathe machine.
This DMG Mori NTX1000 HSC WMZ Lathe  machine was manufactured in the year 2012 in United Kingdom. Th
This DMG Mori NTX1000 HSC WMZ Lathe machine was manufactured in the year 2012 in United Kingdom. Th...
GINDUMAC GmbH

Be seen in all the right places!

Steelfab 2022 Manufacturing Supply Chain Expo 2022 FITMA 2022 Southern Manufacturing 2022 MACH 2022 Intermach 2022 ITM Industry Europe 2022 Manufacturing Indonesia 2022

Production starts on the first road-going Volta Zero electric vehicles

Posted on 18 Nov 2021 and read 383 times
Production starts on the first road-going Volta Zero electric vehiclesVolta Trucks, a leading full-electric commercial vehicle manufacturer and services provider, has started production of the first road-going ‘Design Verification’ (DV) prototype Volta Zero vehicle at a bespoke facility in Coventry.

The DV prototypes are the first full-electric Volta Zero vehicles to be built in the recently unveiled production-ready design. A total of 25 vehicles will be manufactured and once completed in January, the fleet will embark on a rigorous testing regime.

This will involve Volta Trucks engineers replicating a wide range of customer usage and delivery cycles, as well as taking the Volta Zero to the extremes of cold weather environments in the Arctic, hot weathers in equatorial conditions, and crash testing, all to validate the safety, durability, and reliability of the vehicle.

The results of the comprehensive DV testing programme will be fed into the final prototype stage — ‘Production Verification’ (PV). The PV prototype vehicles will be built at the company’s new manufacturing plant in Steyr, Austria, in mid-2022.

Many of these production-specification prototypes will be lent to selected customers for extended periods to be tested in their real-world logistics conditions, undertaking millions of delivery kilometres, alongside Volta Trucks’ own engineers.

Ian Collins, Volta Trucks chief product officer, said: “In August, the first Volta Zero rolling chassis started testing, and we have already extracted huge amounts of data from that vehicle. We have integrated that feedback into the Design Verification prototypes that start production today.

“We now move into a rapid test — learn — iterate — develop phase. This is going to be far more condensed and intensive than a normal vehicle testing programme, given our ambitious timeline to start series production in a year’s time, that is driven by customers’ needs for zero-emission trucks.

“This will take us to some of the hottest, coldest and most extreme conditions in the world, all to ensure that the production specification vehicles that roll off the production line by the end of 2022 deliver the highest possible quality standards and exceed our customers’ expectations.”