Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Mills CNC MPU 2021 Hurco MPU Ceratizit MPU

Machinery-Locator
The online search from the pages of Machinery Market.

Box Table 610 x 450 x 450mm high to suit radial arm drill or build up
Radial Arm Drill Table, Tee Slotted 610 x 450 x 450mm high (24 x 17 1/2 x 17 1/2`)
Ideal for use wi
Radial Arm Drill Table, Tee Slotted 610 x 450 x 450mm high (24 x 17 1/2 x 17 1/2`) Ideal for use wi...

Be seen in all the right places!

MTA Vietnam 2025 Manufacturing Surabaya 2025 EMO 2025 Maktek Konya Advanced Engineering 2025 Maktek Smart MACH 2026

Major funding milestone for world-first prototype fusion plant

Posted on 17 Jun 2025. Edited by: John Hunter. Read 159 times.
Major funding milestone for world-first prototype fusion plantPhoto courtesy of STEP

The UK Government has announced a record £2.5 billion investment in fusion energy, which includes support for a prototype fusion energy plant in Nottinghamshire. The new prototype plant, known as STEP (Spherical Tokamak for Energy Production) will be built at the site of the former West Burton A coal power station near Retford and Gainsborough.

The site was chosen by the Government in 2022 as the location for the project, with its delivery expected to create over 10,000 jobs ranging from construction to operations. The announcement shows the Government’s firm commitment to becoming a ‘clean energy superpower’ by turbocharging innovation in an area that has produced conventional power for generations.

A groundbreaking and world-first scientific endeavour, STEP works by combining hydrogen gases, deuterium and tritium, which are heated to over 150 million °C and confined within a powerful magnetic field. The energy produced can then be used to create steam, to turn a turbine, generating electricity — just like in any conventional power plant.

UK Industrial Fusion Solutions’ CEP Paul Methven said the body responsible for delivering the STEP prototype fusion energy power plant, warmly welcomed the additional funding. He added: “The UK is the world leader in fusion energy research today, and STEP is the beacon programme that aims to take fusion from research to commercial success, generating high quality jobs, multiple spin-offs and boosting the economy nationally and in the East Midlands where we will build the first plant.”

Global lead

“Securing a global lead in such a vital new technology requires bold action; the Government has rightly been bold today and we look forward to delivering the practical steps that will realise the vision of the UK leading in this exciting new sector.”

The end of coal power in Nottinghamshire was marked by the closure of Ratcliffe-on-Soar Power Station in late 2024. With the creation of STEP in West Burton, Nottinghamshire’s “Megawatt Valley” will continue to be at the heart of the UK’s energy production – while leading the world in creating the green, sustainable energy of the future.

The record-breaking £2.5 billion of additional funding announced this week shows the Government’s firm commitment to fusion as a core part of the UK’s future energy mix, and to this significant investment in the economy in Nottinghamshire and the East Midlands.

During a recent visit to the UK’s Fusion Research Campus at Culham, Energy Secretary Ed Miliband said: “After scientists first theorised over 70 years ago that it could be possible, we are now within grasping distance of unlocking the power of the sun and providing families with secure, clean and unlimited energy.”