Looking for a used or new machine tool?
1,000s to choose from
Machinery-Locator
Mills CNC MPU 2021 Ceratizit MPU Bodor MPU XYZ Machine Tools MPU Hurco MPU

Machinery-Locator
The online search from the pages of Machinery Market.

AJAX No 2 Universal Mill
Table 1,400 x 340mm, 
35-1,400rpm, 
universal vertical head, 
7.5hp, 
dual dials, 
horizontal e
Table 1,400 x 340mm, 35-1,400rpm, universal vertical head, 7.5hp, dual dials, horizontal e...

Be seen in all the right places!

Steelfab 2025 Southern Manufacturing 2025 METALTECH & AUTOMEX 2025 ITM Industry Europe EMO 2025 MACH 2026

Blue Ghost prepares ‘to shoot for the Moon’

Posted on 27 Aug 2024. Edited by: John Hunter. Read 553 times.
Blue Ghost prepares ‘to shoot for the Moon’Firefly's fully integrated Blue Ghost lunar lander

Firefly Aerospace, an end-to-end space transportation company, has announced that its Blue Ghost lunar lander has arrived at NASA's Jet Propulsion Laboratory (JPL) for environmental testing before the lander ships to Cape Canaveral for a planned launch in the fourth quarter of 2024. As part of NASA's Commercial Lunar Payload Services (CLPS) initiative, Firefly's Blue Ghost Mission 1 lander is integrated with 10 scientific instruments and technology demonstrations that will help pave the way for astronauts to return to the Moon.

Peter Schumacher, interim CEO at Firefly Aerospace, said: “Firefly is proud to follow in the footsteps of the Surveyor landers that were tested in the same JPL facilities. The extensive environmental testing will complete at JPL combined with the robust testing we have already completed in-house and will further reduce our risk posture and set us up for a successful, soft landing.”

The testing at JPL includes vibration, acoustic, thermal vacuum, and electromagnetic interference and compatibility testing to ensure the integrated lander can withstand various flight environments during launch, transit, and landing on the Moon and follows on from Firefly’s ih-house robust testing campaign, which included extensive qualification testing on the assembled Blue Ghost structure and each component.



Firefly also completed nearly 100 lander leg drop tests on multiple surfaces, including sand, lunar simulant, and concrete, to ensure Blue Ghost’s shock-absorbing footpads can withstand the unpredictable nature of the lunar surface. The team further built a one-acre moonscape at its ‘Rocket Ranch’ to test the hazard avoidance and terrain-relative navigation system on a heavy-lift drone, ensuring the system can identify the safest landing site in the final moments of descent.

Jana Spruce, vice president of spacecraft at Firefly Aerospace, said: “This incredible Firefly team implemented innovative testing approaches that are setting a new standard in the industry. After all the hard work, it is bittersweet to see Blue Ghost leave our Texas-based facility, but we are more than ready for this final test. We will have a dedicated team of Fireflies with the lander every step of the way as Blue Ghost travels from Texas to Florida ahead of this historic journey to the Moon.”

Following final testing, Firefly's Blue Ghost will ship to Cape Canaveral, Florida, ahead of its launch on a SpaceX Falcon 9 rocket scheduled for the third quarter of 2024. Blue Ghost will then begin its transit to the Moon, including approximately a month in Earth orbit and two weeks in lunar orbit. This approach provides ample time to conduct robust health checks on each subsystem and begin payload operations during transit.

Blue Ghost will then land in Mare Crisium, a basin in the northeast quadrant on the Moon's near side, before deploying and operating 10 instruments for a lunar day (14 Earth days) and more than 5hr into the lunar night.